多臺(tái)發(fā)電機(jī)如何并網(wǎng)?船舶發(fā)電機(jī)并車(chē)    

需要安裝同期并網(wǎng)裝置,
    并網(wǎng)的四個(gè)條件:
    1. 多臺(tái)發(fā)電機(jī)的頻率相同。
    2. 多臺(tái)發(fā)電機(jī)出口電壓相同,其最大誤差應(yīng)在5%以內(nèi)。
    3. 多臺(tái)發(fā)電機(jī)相序相同。
    4. 多臺(tái)發(fā)電機(jī)相位一致。

500kw發(fā)電機(jī)與市電并機(jī)注意事項(xiàng)

發(fā)電機(jī)組并網(wǎng)運(yùn)行有幾個(gè)技術(shù)條件:1.可再生能源發(fā)電且裝機(jī)功率大于500kW,國(guó)家是鼓勵(lì)并網(wǎng)發(fā)電的。如果是柴油發(fā)電機(jī)組或者是單機(jī)裝機(jī)功率小于500kW,一般是不能辦理并網(wǎng)發(fā)電手續(xù)的。
2.并網(wǎng)發(fā)電機(jī)組必須配備自動(dòng)同期檢測(cè)裝置(檢測(cè)電壓、頻率、相序)及逆功率保護(hù)裝置(避免反送電),還有電力部門(mén)要求的線路保護(hù)等其他保護(hù)條件,電力調(diào)度專(zhuān)線、及經(jīng)過(guò)培訓(xùn)的電力調(diào)度操作人員。

雙路電源自動(dòng)轉(zhuǎn)換電路,雙電源電路遇到停電是否會(huì)自動(dòng)切換? 


自動(dòng)切換裝置有:雙電源自動(dòng)切換開(kāi)關(guān)(ATS)、接觸器。
雙電源切換開(kāi)關(guān)有很多種有ATS/CTTS/DTTS/ATB/ACTB/STS/SLTS/MVATS/MVCTTS。
常用低壓的雙電源自動(dòng)切換開(kāi)關(guān)有PC級(jí)的和CB級(jí)的。PC級(jí)的采用勵(lì)磁驅(qū)動(dòng),一體式機(jī)構(gòu),具有切換時(shí)間快 安全可靠,切換時(shí)間在100-300毫秒。CB級(jí)是用兩個(gè)斷路器為基礎(chǔ),切換時(shí)間在2000-3000毫秒。

How many generator hooked up? Marine generator and car

Need to install the interconnection device during this period,

Interconnection of the four conditions:

1. The more the frequency of the generator is the same.

2. More than export voltage generator is the same, the maximum error should be within 5%.

3. The generator phase sequence is the same.

4. Many sets of generator in phase.

500 kw generator and mains weaver matters needing attention

Generating unit parallel operation are a few technical conditions: 1. Renewable energy power generation and installed power more than 500 kw, countries is to encourage the grid-connected power generation. If the diesel generator set or single machine installed power less than 500 kw, the general is can't go through the formalities of the grid-connected power generation.

2. Parallel generating unit must be equipped with automatic detection devices (detection voltage, frequency, phase sequence) and reverse power protection device (to avoid the transmission), and line protection and other protection conditions required by the power sector, power dispatching of electric power dispatching dedicated and trained operators.

Double circuit power supply automatically switching circuit, the double power supply automatically switching circuit in a power outage?

Automatic switching device are: dual power automatic transfer switch (ATS), the contactor.

Dual power supplies switch there are many kinds of ATS/CTTS DTTS/ATB/ACTB/STS/SLTS/MVATS/MVCTTS.

Commonly used low pressure double power source automatic switch are PC grade level and CB. PC level driven by excitation, one-piece body, has the fast switch time safe and reliable, switch time from 100 to 300 milliseconds. CB level is to use two circuit breaker, switch time from 2000 to 3000 milliseconds.

 